Robust supply chain design under uncertain demand in agile manufacturing. Zbl 1175.90049
Pan, Feng; Nagi, Rakesh |
|
2010
|
Finite-size facility placement in the presence of barriers to rectilinear travel. Zbl 1163.90623
Savas, Selçuk; Batta, Rajan; Nagi, Rakesh |
|
2002
|
Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs. Zbl 1071.90529
Dastidar, Satyaki Ghosh; Nagi, Rakesh |
|
2005
|
Simultaneous sensor selection and routing of unmanned aerial vehicles for complex mission plans. Zbl 1251.90409
Mufalli, Frank; Batta, Rajan; Nagi, Rakesh |
|
2012
|
Priority-based assignment and routing of a fleet of unmanned combat aerial vehicles. Zbl 1139.90345
Shetty, Vijay K.; Sudit, Moises; Nagi, Rakesh |
|
2008
|
Locating a 1-center on a Manhattan plane with “arbitrarily” shaped barriers. Zbl 1036.90047
Nandikonda, Pavankumar; Batta, Rajan; Nagi, Rakesh |
|
2003
|
Clustering sensors in wireless ad hoc networks operating in a threat environment. Zbl 1165.90370
Patel, Dipesh J.; Batta, Rajan; Nagi, Rakesh |
|
2005
|
Placing a finite size facility with a center objective on a rectangular plane with barriers. Zbl 1127.90046
Sarkar, Avijit; Batta, Rajan; Nagi, Rakesh |
|
2007
|
Modeling of workflow congestion and optimization of flow routing in a manufacturing/warehouse facility. Zbl 1232.90161
Zhang, Min; Batta, Rajan; Nagi, Rakesh |
|
2009
|
Manufacturing cell formation under random product demand. Zbl 0905.90096
Harhalakis, G.; Ioannou, G.; Minis, I.; Nagi, R. |
|
1994
|
Supply facility and input/output point locations in the presence of barriers. Zbl 0994.90004
Wang, Shoou-Jiun; Bhadury, Joyendu; Nagi, Rakesh |
|
2002
|
Contour line construction for a new rectangular facility in an existing layout with rectangular departments. Zbl 1114.90061
Kelachankuttu, Hari; Batta, Rajan; Nagi, Rakesh |
|
2007
|
Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies. Zbl 0947.90568
Anwar, M. F.; Nagi, R. |
|
1998
|
An integrated formulation of manufacturing cell formation with capacity planning and multiple routings. Zbl 0911.90189
Ramabhatta, Vishwanath; Nagi, Rakesh |
|
1998
|
The \(K\)-connection location problem in a plane. Zbl 1114.90060
Huang, Simin; Batta, Rajan; Klamroth, Kathrin; Nagi, Rakesh |
|
2005
|
Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups. Zbl 0942.90546
Anwar, M. F.; Nagi, R. |
|
1997
|
New lot-sizing formulations for less nervous production schedules. Zbl 0971.90028
Kazan, Osman; Nagi, Rakesh; Rump, Christopher M. |
|
2000
|
Data fusion/data mining-based architecture for condition-based maintenance. Zbl 1128.90329
Raheja, D.; Llinas, J.; Nagi, R.; Romanowski, C. |
|
2006
|
Comparison of gradient estimation techniques for queues with non- identical servers. Zbl 0830.90055
Fu, Michael C.; Hu, Jian-Qiang; Nagi, Rakesh |
|
1995
|
A review of agile manufacturing systems. Zbl 1114.90364
Sanchez, Luis M.; Nagi, Rakesh |
|
2001
|
Manufacturing cell formation by state-space search. Zbl 0857.90053
Ghosh, Subrata; Mahanti, Ambuj; Nagi, Rakesh; Nau, Dana S. |
|
1996
|
A practical method for design of hybrid-type production facilities. Zbl 0946.90546
Harhalakis, G.; Lu, T.; Minis, I.; Nagi, R. |
|
1996
|
Controlling a fleet of unmanned aerial vehicles to collect uncertain information in a threat environment. Zbl 1407.93045
Xia, Yan; Batta, Rajan; Nagi, Rakesh |
|
2017
|
Distribution network design: selection and sizing of congested connections. Zbl 1278.90063
Huang, Simin; Batta, Rajan; Nagi, Rakesh |
|
2005
|
Facility placement with sub-aisle design in an existing layout. Zbl 1157.90404
Zhang, Min; Savas, Selçuk; Batta, Rajan; Nagi, Rakesh |
|
2009
|
Cycle time reduction by improved MRP-based production planning. Zbl 1032.90503
Agrawal, Ashutosh; Minis, Ioannis; Nagi, Rakesh |
|
2000
|
Dominance rules for the optimal placement of a finite-size facility in an existing layout. Zbl 1348.90386
Date, Ketan; Makked, Suryaansh; Nagi, Rakesh |
|
2014
|
Strategic capacity planning in supply chain design for a new market opportunity. Zbl 1059.90006
Chauhan, Satyaveer S.; Nagi, Rakesh; Proth, Jean-Marie |
|
2004
|
Finding rectilinear least cost paths in the presence of convex polygonal congested regions. Zbl 1179.90258
Sarkar, Avijit; Batta, Rajan; Nagi, Rakesh |
|
2009
|
Data mining in an engineering design environment: OR applications from graph matching. Zbl 1113.90062
Romanowski, Carol J.; Nagi, Rakesh; Sudit, Moises |
|
2006
|
Opportunistic supply chain formation from qualified partners for a new market demand. Zbl 1171.90332
Chauhan, S. S.; Proth, J-M; Sarmiento, A. M.; Nagi, R. |
|
2006
|
Level 2 reformulation linearization technique-based parallel algorithms for solving large quadratic assignment problems on graphics processing unit clusters. Zbl 1528.90174
Date, Ketan; Nagi, Rakesh |
|
2019
|
Bias properties of infinitesimal perturbation analysis for systems with parallel servers. Zbl 0767.93076
Fu, Michael C.; Hu, Jian-Qiang; Nagi, Rakesh |
|
1992
|
The temporal aspects of the evidence-based influence maximization on social networks. Zbl 1364.91131
Samadi, Mohammadreza; Nikolaev, Alexander; Nagi, Rakesh |
|
2017
|
Simultaneous siting and sizing of distribution centers on a plane. Zbl 1166.90010
Huang, Simin; Batta, Rajan; Nagi, Rakesh |
|
2009
|
A machine learning approach to optimise the usage of recycled material in a remanufacturing environment. Zbl 1197.90167
Shah, Purvin; Gosavi, Abhijit; Nagi, Rakesh |
|
2010
|
Level 2 reformulation linearization technique-based parallel algorithms for solving large quadratic assignment problems on graphics processing unit clusters. Zbl 1528.90174
Date, Ketan; Nagi, Rakesh |
|
2019
|
Controlling a fleet of unmanned aerial vehicles to collect uncertain information in a threat environment. Zbl 1407.93045
Xia, Yan; Batta, Rajan; Nagi, Rakesh |
|
2017
|
The temporal aspects of the evidence-based influence maximization on social networks. Zbl 1364.91131
Samadi, Mohammadreza; Nikolaev, Alexander; Nagi, Rakesh |
|
2017
|
Dominance rules for the optimal placement of a finite-size facility in an existing layout. Zbl 1348.90386
Date, Ketan; Makked, Suryaansh; Nagi, Rakesh |
|
2014
|
Simultaneous sensor selection and routing of unmanned aerial vehicles for complex mission plans. Zbl 1251.90409
Mufalli, Frank; Batta, Rajan; Nagi, Rakesh |
|
2012
|
Robust supply chain design under uncertain demand in agile manufacturing. Zbl 1175.90049
Pan, Feng; Nagi, Rakesh |
|
2010
|
A machine learning approach to optimise the usage of recycled material in a remanufacturing environment. Zbl 1197.90167
Shah, Purvin; Gosavi, Abhijit; Nagi, Rakesh |
|
2010
|
Modeling of workflow congestion and optimization of flow routing in a manufacturing/warehouse facility. Zbl 1232.90161
Zhang, Min; Batta, Rajan; Nagi, Rakesh |
|
2009
|
Facility placement with sub-aisle design in an existing layout. Zbl 1157.90404
Zhang, Min; Savas, Selçuk; Batta, Rajan; Nagi, Rakesh |
|
2009
|
Finding rectilinear least cost paths in the presence of convex polygonal congested regions. Zbl 1179.90258
Sarkar, Avijit; Batta, Rajan; Nagi, Rakesh |
|
2009
|
Simultaneous siting and sizing of distribution centers on a plane. Zbl 1166.90010
Huang, Simin; Batta, Rajan; Nagi, Rakesh |
|
2009
|
Priority-based assignment and routing of a fleet of unmanned combat aerial vehicles. Zbl 1139.90345
Shetty, Vijay K.; Sudit, Moises; Nagi, Rakesh |
|
2008
|
Placing a finite size facility with a center objective on a rectangular plane with barriers. Zbl 1127.90046
Sarkar, Avijit; Batta, Rajan; Nagi, Rakesh |
|
2007
|
Contour line construction for a new rectangular facility in an existing layout with rectangular departments. Zbl 1114.90061
Kelachankuttu, Hari; Batta, Rajan; Nagi, Rakesh |
|
2007
|
Data fusion/data mining-based architecture for condition-based maintenance. Zbl 1128.90329
Raheja, D.; Llinas, J.; Nagi, R.; Romanowski, C. |
|
2006
|
Data mining in an engineering design environment: OR applications from graph matching. Zbl 1113.90062
Romanowski, Carol J.; Nagi, Rakesh; Sudit, Moises |
|
2006
|
Opportunistic supply chain formation from qualified partners for a new market demand. Zbl 1171.90332
Chauhan, S. S.; Proth, J-M; Sarmiento, A. M.; Nagi, R. |
|
2006
|
Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs. Zbl 1071.90529
Dastidar, Satyaki Ghosh; Nagi, Rakesh |
|
2005
|
Clustering sensors in wireless ad hoc networks operating in a threat environment. Zbl 1165.90370
Patel, Dipesh J.; Batta, Rajan; Nagi, Rakesh |
|
2005
|
The \(K\)-connection location problem in a plane. Zbl 1114.90060
Huang, Simin; Batta, Rajan; Klamroth, Kathrin; Nagi, Rakesh |
|
2005
|
Distribution network design: selection and sizing of congested connections. Zbl 1278.90063
Huang, Simin; Batta, Rajan; Nagi, Rakesh |
|
2005
|
Strategic capacity planning in supply chain design for a new market opportunity. Zbl 1059.90006
Chauhan, Satyaveer S.; Nagi, Rakesh; Proth, Jean-Marie |
|
2004
|
Locating a 1-center on a Manhattan plane with “arbitrarily” shaped barriers. Zbl 1036.90047
Nandikonda, Pavankumar; Batta, Rajan; Nagi, Rakesh |
|
2003
|
Finite-size facility placement in the presence of barriers to rectilinear travel. Zbl 1163.90623
Savas, Selçuk; Batta, Rajan; Nagi, Rakesh |
|
2002
|
Supply facility and input/output point locations in the presence of barriers. Zbl 0994.90004
Wang, Shoou-Jiun; Bhadury, Joyendu; Nagi, Rakesh |
|
2002
|
A review of agile manufacturing systems. Zbl 1114.90364
Sanchez, Luis M.; Nagi, Rakesh |
|
2001
|
New lot-sizing formulations for less nervous production schedules. Zbl 0971.90028
Kazan, Osman; Nagi, Rakesh; Rump, Christopher M. |
|
2000
|
Cycle time reduction by improved MRP-based production planning. Zbl 1032.90503
Agrawal, Ashutosh; Minis, Ioannis; Nagi, Rakesh |
|
2000
|
Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies. Zbl 0947.90568
Anwar, M. F.; Nagi, R. |
|
1998
|
An integrated formulation of manufacturing cell formation with capacity planning and multiple routings. Zbl 0911.90189
Ramabhatta, Vishwanath; Nagi, Rakesh |
|
1998
|
Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups. Zbl 0942.90546
Anwar, M. F.; Nagi, R. |
|
1997
|
Manufacturing cell formation by state-space search. Zbl 0857.90053
Ghosh, Subrata; Mahanti, Ambuj; Nagi, Rakesh; Nau, Dana S. |
|
1996
|
A practical method for design of hybrid-type production facilities. Zbl 0946.90546
Harhalakis, G.; Lu, T.; Minis, I.; Nagi, R. |
|
1996
|
Comparison of gradient estimation techniques for queues with non- identical servers. Zbl 0830.90055
Fu, Michael C.; Hu, Jian-Qiang; Nagi, Rakesh |
|
1995
|
Manufacturing cell formation under random product demand. Zbl 0905.90096
Harhalakis, G.; Ioannou, G.; Minis, I.; Nagi, R. |
|
1994
|
Bias properties of infinitesimal perturbation analysis for systems with parallel servers. Zbl 0767.93076
Fu, Michael C.; Hu, Jian-Qiang; Nagi, Rakesh |
|
1992
|