A concise survey of scheduling with time-dependent processing times. Zbl 1030.90023
Cheng, T. C. E.; Ding, Q.; Lin, B. M. T. |
|
2004
|
A survey of scheduling problems with setup times or costs. Zbl 1137.90474
Allahverdi, Ali; Ng, C. T.; Cheng, T. C. E.; Kovalyov, Mikhail Y. |
|
2008
|
Single machine scheduling with learning effect considerations. Zbl 0967.68019
Cheng, T. C. Edwin; Wang, Guoqing |
|
2000
|
Survey of scheduling research involving due date determination decisions. Zbl 0658.90049
Cheng, T. C. E.; Gupta, M. C. |
|
1989
|
Price and lead time decisions in dual-channel supply chains. Zbl 1188.90010
Hua, Guowei; Wang, Shouyang; Cheng, T. C. E. |
|
2010
|
A state-of-the-art review of parallel-machine scheduling research. Zbl 0707.90053
Cheng, T. C. E.; Sin, C. C. S. |
|
1990
|
Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs. Zbl 1100.68007
Cheng, T. C. E.; Ng, C. T.; Yuan, J. J. |
|
2006
|
Multi-agent scheduling on a single machine with max-form criteria. Zbl 1129.90023
Cheng, T. C. E.; Ng, C. T.; Yuan, J. J. |
|
2008
|
Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects. Zbl 1172.90397
Cheng, T. C. Edwin; Wu, Chin-Chia; Lee, Wen-Chiung |
|
2008
|
A note on the complexity of the problem of two-agent scheduling on a single machine. Zbl 1126.90027
Ng, C. T.; Cheng, T. C. E.; Yuan, J. J. |
|
2006
|
Fixed interval scheduling: models, applications, computational complexity and algorithms. Zbl 1107.90019
Kovalyov, Mikhail Y.; Ng, C. T.; Cheng, T. C. Edwin |
|
2007
|
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Zbl 0783.90054
Lee, Chung-Yee; Cheng, T. C. E.; Lin, B. M. T. |
|
1993
|
Scheduling start time dependent jobs to minimize the total weighted completion time. Zbl 1059.90063
Bachman, A.; Cheng, T. C. E.; Janiak, A.; Ng, C. T. |
|
2002
|
Scheduling problems with the effects of deterioration and learning. Zbl 1121.90066
Wang, Jibo; Cheng, T. C. Edwin |
|
2007
|
Scheduling linear deteriorating jobs with an availability constraint on a single machine. Zbl 1100.68009
Ji, Min; He, Yong; Cheng, T. C. E. |
|
2006
|
Single machine scheduling with batch deliveries. Zbl 0947.90579
Cheng, T. C. Edwin; Gordon, Valery S.; Kovalyov, Mikhail Y. |
|
1996
|
Single-machine scheduling with sum-of-logarithm-processing-times-based learning considerations. Zbl 1170.90387
Cheng, T. C. E.; Lai, Peng-Jen; Wu, Chin-Chia; Lee, Wen-Chiung |
|
2009
|
Coordination of supply chains by option contracts: a cooperative game theory approach. Zbl 1205.90061
Zhao, Yingxue; Wang, Shouyang; Cheng, T. C. E.; Yang, Xiaoqi; Huang, Zhimin |
|
2010
|
Bicriterion single machine scheduling with resource dependent processing times. Zbl 0907.68113
Cheng, T. C. Edwin; Janiak, Adam; Kovalyov, Mikhail Y. |
|
1998
|
Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint. Zbl 1180.90143
Wang, Ji-Bo; Ng, C. T.; Cheng, T. C. E. |
|
2008
|
Single-machine scheduling with periodic maintenance to minimize makespan. Zbl 1159.90404
Ji, Min; He, Yong; Cheng, T. C. E. |
|
2007
|
The complexity of scheduling starting time dependent tasks with release times. Zbl 1338.68096
Cheng, T. C. E.; Ding, Q. |
|
1998
|
Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan. Zbl 1110.90045
Wang, Xiuli; Cheng, T. C. Edwin |
|
2007
|
Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance. Zbl 1183.90203
Yang, Suh-Jenq; Yang, Dar-Li; Cheng, T. C. E. |
|
2010
|
Product variety and channel structure strategy for a retailer-Stackelberg supply chain. Zbl 1339.90177
Xiao, Tiaojun; Choi, Tsan-Ming; Cheng, T. C. E. |
|
2014
|
Parallel-machine scheduling with simple linear deterioration to minimize total completion time. Zbl 1149.90343
Ji, Min; Cheng, T. C. E. |
|
2008
|
Parallel-machine scheduling problems with earliness and tardiness penalties. Zbl 0829.90077
Cheng, T. C. E.; Chen, Z.-L. |
|
1994
|
Single machine scheduling with step-deteriorating processing times. Zbl 0984.90014
Cheng, T. C. E.; Ding, Q. |
|
2001
|
Bounded single-machine parallel-batch scheduling with release dates and rejection. Zbl 1160.90477
Lu, Lingfa; Cheng, T. C. E.; Yuan, Jinjiang; Zhang, Liqi |
|
2009
|
Paired domination on interval and circular-arc graphs. Zbl 1124.05070
Cheng, T. C. E.; Kang, L. Y.; Ng, C. T. |
|
2007
|
An economic production quantity model with flexibility and reliability considerations. Zbl 0672.90039
Cheng, T. C. E. |
|
1989
|
Scheduling with job-dependent learning effects and multiple rate-modifying activities. Zbl 1229.90061
Ji, Min; Cheng, T. C. E. |
|
2010
|
Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Zbl 1104.90023
Wang, Ji-Bo; Ng, C. T. Daniel; Cheng, T. C. E.; Liu, Li-Li |
|
2006
|
Machine scheduling with an availability constraint and job delivery coordination. Zbl 1124.90011
Wang, Xiuli; Cheng, T. C. Edwin |
|
2007
|
A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs. Zbl 1171.90404
Ng, C. T.; Wang, J.-B.; Cheng, T. C. E.; Liu, L. L. |
|
2010
|
Online scheduling on unbounded parallel-batch machines to minimize the makespan. Zbl 1206.68072
Tian, Ji; Cheng, T. C. E.; Ng, C. T.; Yuan, Jinjiang |
|
2009
|
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan. Zbl 1213.90121
Li, Shisheng; Ng, C. T.; Cheng, T. C. E.; Yuan, Jinjiang |
|
2011
|
An improved heuristic for two-machine flowshop scheduling with an availability constraint. Zbl 0982.90022
Cheng, T. C. Edwin; Wang, Guoqing |
|
2000
|
Optimal common due-date with limited completion time deviation. Zbl 0635.90050
Cheng, T. C. E. |
|
1988
|
Semi-on-line multiprocessor scheduling with given total processing time. Zbl 1087.68015
Cheng, T. C. Edwin; Kellerer, Hans; Kotov, Vladimir |
|
2005
|
\(CON/SLK\) due date assignment and scheduling on a single machine with two agents. Zbl 1411.90166
Yin, Yunqiang; Wang, Du-Juan; Wu, Chin-Chia; Cheng, T. C. E. |
|
2016
|
Resource optimal control in some single-machine scheduling problems. Zbl 0816.90080
Cheng, T. C. E.; Janiak, A. |
|
1994
|
Parallel-machine scheduling of simple linear deteriorating jobs. Zbl 1171.68003
Ji, Min; Cheng, T. C. E. |
|
2009
|
Due-date assignment and single machine scheduling with deteriorating jobs. Zbl 1095.90036
Cheng, T. C. E.; Kang, L.; Ng, C. T. |
|
2004
|
Single machine scheduling with a variable common due date and resource-dependent processing times. Zbl 1047.90022
Ng, C. T. Daniel; Cheng, T. C. Edwin; Kovalyov, Mikhail Y.; Lam, S. S. |
|
2003
|
Two-agent scheduling with position-based deteriorating jobs and learning effects. Zbl 1231.90182
Cheng, T. C. E.; Wu, Wen-Hsiang; Cheng, Shuenn-Ren; Wu, Chin-Chia |
|
2011
|
On scheduling an unbounded batch machine. Zbl 1013.90065
Liu, Zhaohui; Yuan, Jinjiang; Cheng, T. C. Edwin |
|
2003
|
Scheduling with a position-weighted learning effect based on sum-of-logarithm-processing-times and job position. Zbl 1293.90023
Cheng, T. C. E.; Kuo, Wen-Hung; Yang, Dar-Li |
|
2013
|
Coordination of supply chains with bidirectional option contracts. Zbl 1317.90062
Zhao, Yingxue; Ma, Lijun; Xie, Gang; Cheng, T. C. E. |
|
2013
|
Complexity results for flow-shop and open-shop scheduling problems with transportation delays. Zbl 1056.90057
Brucker, Peter; Knust, Sigrid; Cheng, T. C. Edwin; Shakhlevich, Natalia V. |
|
2004
|
“Product partition” and related problems of scheduling and systems reliability: computational complexity and approximation. Zbl 1205.68174
Ng, C. T.; Barketau, M. S.; Cheng, T. C. E.; Kovalyov, Mikhail Y. |
|
2010
|
Makespan minimization in the two-machine flowshop batch scheduling problem. Zbl 0973.90031
Cheng, T. C. E.; Lin, B. M. T.; Toker, A. |
|
2000
|
Parallel machine scheduling to minimize costs for earliness and number of tardy jobs. Zbl 0816.90084
Kahlbacher, H. G.; Cheng, T. C. E. |
|
1993
|
Single machine batch scheduling with resource dependent setup and processing times. Zbl 1077.90525
Cheng, T. C. Edwin; Janiak, Adam; Kovalyov, Mikhail Y. |
|
2001
|
Two-agent scheduling to minimize the total cost. Zbl 1237.90094
Nong, Q. Q.; Cheng, T. C. E.; Ng, C. T. |
|
2011
|
Scheduling jobs with piecewise linear decreasing processing times. Zbl 1043.90027
Cheng, T. C. Edwin; Ding, Qing; Kovalyov, Mikhail Y.; Bachman, Aleksander; Janiak, Adam |
|
2003
|
Minimizing makespan in a two-machine flow shop with effects of deterioration and learning. Zbl 1259.90039
Wang, Ji-Bo; Ji, P.; Cheng, T. C. E.; Wang, Dan |
|
2012
|
An economic order quantity model with demand-dependent unit cost. Zbl 0665.90017
Cheng, T. C. E. |
|
1989
|
Supply option contracts with spot market and demand information updating. Zbl 1403.90192
Zhao, Yingxue; Choi, Tsan-Ming; Cheng, T. C. E.; Wang, Shouyang |
|
2018
|
Single-machine scheduling with deteriorating jobs and past-sequence-dependent setup times. Zbl 1217.90103
Cheng, T. C. E.; Lee, Wen-Chiung; Wu, Chin-Chia |
|
2011
|
Two-agent single-machine scheduling with assignable due dates. Zbl 1291.90102
Yin, Yunqiang; Cheng, Shuenn-Ren; Cheng, T. C. E.; Wu, Chin-Chia; Wu, Wen-Hsiang |
|
2012
|
Bounded parallel-batching scheduling with two competing agents. Zbl 1280.90043
Fan, B. Q.; Cheng, T. C. E.; Li, S. S.; Feng, Q. |
|
2013
|
An algorithm for the CON due-date determination and sequencing problem. Zbl 0634.90030
Cheng, T. C. E. |
|
1987
|
Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times. Zbl 1138.90396
Leung, Joseph Y.-T.; Ng, C. T.; Cheng, T. C. Edwin |
|
2008
|
Group scheduling with controllable setup and processing times: minimizing total weighted completion time. Zbl 1119.90020
Ng, C. T.; Cheng, T. C. Edwin; Janiak, Adam; Kovalyov, Mikhail Y. |
|
2005
|
The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan. Zbl 1067.90050
Yuan, J. J.; Liu, Z. H.; Ng, C. T.; Cheng, T. C. E. |
|
2004
|
Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities. Zbl 1251.90202
Yang, Dar-Li; Cheng, T. C. E.; Yang, Suh-Jenq; Hsu, Chou-Jung |
|
2012
|
Two-stage flowshop scheduling with a common second-stage machine. Zbl 0883.90067
Oğuz, Ceyda; Lin, Bertrand M. T.; Cheng, T. C. Edwin |
|
1997
|
Buy online and pick up in-store: design of the service area. Zbl 1403.90129
Jin, Ming; Li, Gang; Cheng, T. C. E. |
|
2018
|
Make-or-buy service capacity decision in a supply chain providing after-sales service. Zbl 1339.90059
Li, Gang; Huang, Feng Feng; Cheng, T. C. E.; Zheng, Quan; Ji, Ping |
|
2014
|
Single machine scheduling to minimize total weighted tardiness. Zbl 1066.90025
Cheng, T. C. E.; Ng, C. T.; Yuan, J. J.; Liu, Z. H. |
|
2005
|
Bicyclic graphs with the first three smallest and largest values of the first general Zagreb index. Zbl 1274.05082
Zhang, Shenggui; Wang, Wei; Cheng, T. C. Edwin |
|
2006
|
Optimal due-date assignment in a job shop. Zbl 0585.90048
Cheng, T. C. E. |
|
1986
|
Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness. Zbl 1215.90025
Cheng, T. C. E.; Hsu, Chou-Jung; Huang, Yi-Chi; Lee, Wen-Chiung |
|
2011
|
The parallel machine min-max weighted absolute lateness scheduling problem. Zbl 0808.90082
Li, Chung-Lun; Cheng, T. C. E. |
|
1994
|
Optimal due-date determination and sequencing of n jobs on a single machine. Zbl 0532.90049
Cheng, T. C. E. |
|
1984
|
Approximation schemes for single-machine scheduling with a fixed maintenance activity to minimize the total amount of late work. Zbl 1411.90132
Yin, Yunqiang; Xu, Jianyou; Cheng, T. C. E.; Wu, Chin-Chia; Wang, Du-Juan |
|
2016
|
A bicriterion approach to common flow allowances due window assignment and scheduling with controllable processing times. Zbl 1411.90162
Wang, Dujuan; Yin, Yunqiang; Cheng, T. C. E. |
|
2017
|
Single machine batch scheduling with deadlines and resource dependent processing times. Zbl 0858.90073
Cheng, T. C. Edwin; Kovalyov, Mikhail Y. |
|
1995
|
Scheduling with delivery and earliness penalties. Zbl 0789.90041
Cheng, T. C. E.; Kahlbacher, H. G. |
|
1993
|
EPQ with process capability and quality assurance considerations. Zbl 0729.90757
Cheng, T. C. E. |
|
1991
|
Rescheduling on identical parallel machines with machine disruptions to minimize total completion time. Zbl 1346.90399
Yin, Yunqiang; Cheng, T. C. E.; Wang, Du-Juan |
|
2016
|
Single machine scheduling with deadlines and increasing rates of processing times. Zbl 0958.68018
Cheng, T. C. E.; Ding, Q. |
|
2000
|
A polynomial-time algorithm for the paired-domination problem on permutation graphs. Zbl 1168.05366
Cheng, T. C. E.; Kang, Liying; Shan, Erfang |
|
2009
|
Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time. Zbl 1252.90024
Hsu, Chou-Jung; Cheng, T. C. E.; Yang, Dar-Li |
|
2011
|
Batch delivery scheduling with batch delivery cost on a single machine. Zbl 1125.90018
Ji, Min; He, Yong; Cheng, T. C. E. |
|
2007
|
Single-machine scheduling with trade-off between number of tardy jobs and resource allocation. Zbl 0874.90105
Cheng, T. C. E.; Chen, Z.-L.; Li, Chung-Lun |
|
1996
|
Two-machine flowshop scheduling with consecutive availability constraints. Zbl 0994.90066
Cheng, T. C. Edwin; Wang, Guoqing |
|
1999
|
A heuristic for common due-date assignment and job scheduling on parallel machines. Zbl 0699.90060
Cheng, T. C. E. |
|
1989
|
Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents. Zbl 1407.90185
Yin, Yunqiang; Yang, Yongjian; Wang, Dujuan; Cheng, T. C. E.; Wu, Chin-Chia |
|
2018
|
A tabu search/path relinking algorithm to solve the job shop scheduling problem. Zbl 1348.90298
Peng, Bo; Lü, Zhipeng; Cheng, T. C. E. |
|
2015
|
Concurrent open shop scheduling to minimize the weighted number of tardy jobs. Zbl 1027.90033
Ng, C. T.; Cheng, T. C. E.; Yuan, J. J. |
|
2003
|
Single machine scheduling with a restricted rate-modifying activity. Zbl 1090.90084
He, Yong; Ji, Min; Cheng, T. C. E. |
|
2005
|
Single-machine scheduling with deteriorating functions for job processing times. Zbl 1201.90073
Cheng, T. C. E.; Lee, Wen-Chiung; Wu, Chin-Chia |
|
2010
|
A proof for the longest-job-first policy in one-machine scheduling. Zbl 0739.90032
Cheng, T. C. E.; Kahlbacher, H. G. |
|
1991
|
Single-machine scheduling with a common due window. Zbl 0990.90050
Yeung, W. K.; Oguz, Ceyda; Cheng, T. C. Edwin |
|
2001
|
Batch scheduling and common due-date assignment on a single machine. Zbl 0871.90044
Cheng, T. C. Edwin; Kovalyov, Mikhail Y. |
|
1996
|
Single machine scheduling to minimize batch delivery and job earliness penalties. Zbl 0874.68142
Cheng, T. C. Edwin; Kovalyov, Mikhail Y.; Lin, Bertrand M.-T. |
|
1997
|
An FPTAS for parallel-machine scheduling under a grade of service provision to minimize makespan. Zbl 1191.68102
Ji, Min; Cheng, T. C. E. |
|
2008
|
Scheduling to minimize the total compression and late costs. Zbl 0897.90125
Cheng, T. C. E.; Chen, Zhi-Long; Li, Chung-Lun; Lin, B. M.-T. |
|
1998
|
Revenue sharing or not? Coordination of the buy-online-and-pickup-in-store supply chain. Zbl 07797339
Peng, Yang; Lu, Junjie; Cheng, Tai Chiu Edwin; Ji, Min |
|
2024
|
Newsvendor model with voucher sales: a distributionally robust approach. Zbl 07816777
Zhong, Yuanguang; Jiang, Xinhong; Zhang, Xiong; Min, Jie; Cheng, T. C. Edwin |
|
2024
|
A branch-and-price-and-cut algorithm for the truck-drone routing problem with simultaneously delivery and pickup. Zbl 1534.90019
Li, Dongwei; Ignatius, Joshua; Wang, Dujuan; Yin, Yunqiang; Cheng, T. C. E. |
|
2024
|
A branch-and-price-and-cut algorithm for the truck-based drone delivery routing problem with time windows. Zbl 07709391
Yin, Yunqiang; Li, Dongwei; Wang, Dujuan; Ignatius, Joshua; Cheng, T. C. E.; Wang, Sutong |
|
2023
|
Coordination of a platform-based supply chain in the marketplace or reselling mode considering cross-channel effect and blockchain technology. Zbl 1531.90050
Xu, Xiaoping; He, Ping; Zhou, Li; Cheng, T. C. E. |
|
2023
|
Distributionally robust multi-period location-allocation with multiple resources and capacity levels in humanitarian logistics. Zbl 1541.90092
Yang, Yongjian; Yin, Yunqiang; Wang, Dujuan; Ignatius, Joshua; Cheng, T. C. E.; Dhamotharan, Lalitha |
|
2023
|
Optimal selection of supply chain financing programmes for a financially distressed manufacturer. Zbl 1541.90059
Jena, Sarat Kumar; Padhi, Sidhartha S.; Cheng, T. C. E. |
|
2023
|
When is it wise to use blockchain for platform operations with remanufacturing? Zbl 07709388
Xu, Xiaoping; Yan, Luling; Choi, Tsan-Ming; Cheng, T. C. E. |
|
2023
|
Robust optimization for the electric vehicle pickup and delivery problem with time windows and uncertain demands. Zbl 07706538
Liu, Xiaochang; Wang, Dujuan; Yin, Yunqiang; Cheng, T. C. E. |
|
2023
|
Purchase or rent? Optimal pricing for 3D printing capacity sharing platforms. Zbl 07709073
Sun, Luoyi; Hua, Guowei; Cheng, T. C. E.; Teunter, Ruud H.; Dong, Jingxin; Wang, Yixiao |
|
2023
|
Wasserstein distributionally robust chance-constrained program with moment information. Zbl 07706559
Luo, Zunhao; Yin, Yunqiang; Wang, Dujuan; Cheng, T. C. E.; Wu, Chin-Chia |
|
2023
|
Impacts of the minimum quantity contract on an online retail platform. Zbl 1541.90047
Chen, Yujing; Zhong, Yuanguang; Cheng, T. C. E. |
|
2023
|
Production/inventory competition between firms with fixed-proportions co-production systems. Zbl 1490.90021
He, Shuang; Zhang, Jian; Zhang, Juliang; Cheng, T. C. E. |
|
2022
|
Lead-time quotation and hedging coordination in make-to-order supply chain. Zbl 1495.90011
Zhai, Yue; Cheng, T. C. E. |
|
2022
|
Multi-period green reverse logistics network design: an improved Benders-decomposition-based heuristic approach. Zbl 1524.90075
Reddy, K. Nageswara; Kumar, Akhilesh; Choudhary, Alok; Cheng, T. C. Edwin |
|
2022
|
Bounds for two multicolor Ramsey numbers concerning quadrilaterals. Zbl 1485.05112
Zhang, Xuemei; Chen, Yaojun; Cheng, T. C. Edwin |
|
2022
|
Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost. Zbl 1490.90127
Gao, Yuan; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. |
|
2022
|
On cycle-nice claw-free graphs. Zbl 1490.05224
Zhang, Shanshan; Wang, Xiumei; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. |
|
2022
|
An online algorithm for the inventory retrieval problem with an uncertain selling duration, uncertain prices, and price-dependent demands. Zbl 1520.90008
He, Xiaozhou; Xiang, Jie; Xiao, Jin; Cheng, T. C. E.; Tian, Yuhang |
|
2022
|
Pareto-scheduling with double-weighted jobs to minimize the weighted number of tardy jobs and total weighted late work. Zbl 1523.90159
Guo, Shuen; Lu, Lingfa; Yuan, Jinjiang; Ng, Chi To; Cheng, Tai Chiu Edwin |
|
2022
|
Parallel-machine scheduling in shared manufacturing. Zbl 1499.90076
Ji, Min; Ye, Xinna; Qian, Fangyao; Cheng, T. C. E.; Jiang, Yiwei |
|
2022
|
Single-machine serial-batch delivery scheduling with two competing agents and due date assignment. Zbl 1462.90053
Yin, Yunqiang; Li, Doudou; Wang, Dujuan; Cheng, T. C. E. |
|
2021
|
Four decades of research on the open-shop scheduling problem to minimize the makespan. Zbl 1487.90260
Ahmadian, Mohammad Mahdi; Khatami, Mostafa; Salehipour, Amir; Cheng, T. C. E. |
|
2021
|
A note on competing-agent Pareto-scheduling. Zbl 1460.90087
Gao, Yuan; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. |
|
2021
|
A meta-heuristic to solve the just-in-time job-shop scheduling problem. Zbl 1487.90261
Ahmadian, Mohammad Mahdi; Salehipour, Amir; Cheng, T. C. E. |
|
2021
|
Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work. Zbl 1468.90049
He, Ruyan; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. |
|
2021
|
Pareto-optimization of three-agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work. Zbl 1523.90226
Zhang, Yuan; Yuan, Jinjiang; Ng, Chi To; Cheng, Tai Chiu E. |
|
2021
|
Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion. Zbl 1487.90280
Chen, Rubing; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. |
|
2021
|
Joint optimization of order sequencing and rack scheduling in the robotic mobile fulfilment system. Zbl 1511.90087
Yang, Xiying; Hua, Guowei; Hu, Linyuan; Cheng, T. C. E.; Huang, Anqiang |
|
2021
|
Degree sums and dominating cycles. Zbl 1456.05127
Wu, Yueyu; Chen, Yaojun; Cheng, T. C. Edwin |
|
2021
|
Optimal bi-criterion planning of rescue and evacuation operations for marine accidents using an iterative scheduling algorithm. Zbl 1462.90061
Ng, Chi To; Cheng, T. C. E.; Levner, Eugene; Kriheli, Boris |
|
2021
|
Operations strategies with snobbish and strategic consumers. Zbl 1527.91104
Lee, Chang Hwan; Choi, Tsan-Ming; Cheng, T.-C. Edwin |
|
2021
|
Scheduling with release dates and preemption to minimize multiple max-form objective functions. Zbl 1430.90296
Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. |
|
2020
|
Coupled task scheduling with exact delays: literature review and models. Zbl 1430.90271
Khatami, Mostafa; Salehipour, Amir; Cheng, T. C. E. |
|
2020
|
Due date-related scheduling with two agents. Models and algorithms. Zbl 1439.90038
Yin, Yunqiang; Wang, Dujuan; Cheng, T. C. Edwin |
|
2020
|
Two-agent scheduling with linear resource-dependent processing times. Zbl 1523.90207
Wang, Dujuan; Yu, Yugang; Qiu, Huaxin; Yin, Yunqiang; Cheng, T. C. E. |
|
2020
|
Single bounded parallel-batch machine scheduling with an unavailability constraint and job delivery. Zbl 1470.90027
Fan, Jing; Ng, C. T.; Cheng, T. C. E.; Shi, Hui |
|
2020
|
Stochastic production capacity: a bane or a boon for quick response supply chains? Zbl 1523.90015
Zhang, Juzhi; Choi, Tsan-Ming; Cheng, T. C. E. |
|
2020
|
Purchase and retrieval competition for seasonal produce. Zbl 1536.90009
Zhang, Jian; He, Shuang; Zhang, Juliang; Cheng, T. C. Edwin |
|
2020
|
Optimal production-inventory policy for the multi-period fixed proportions co-production system. Zbl 1430.90233
Liu, Hengyu; Zhang, Juliang; Cheng, T. C. E.; Ru, Yihong |
|
2020
|
Single-machine scheduling with deadlines to minimize the total weighted late work. Zbl 1423.90084
Chen, Rubing; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. |
|
2019
|
A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan. Zbl 1403.90328
Gao, Yuan; Yuan, Jinjiang; Ng, C. T.; Cheng, T. C. E. |
|
2019
|
An exact branch-and-price algorithm for multitasking scheduling on unrelated parallel machines. Zbl 1421.90066
Xiong, Xiaoyun; Zhou, Peng; Yin, Yunqiang; Cheng, T. C. E.; Li, Dengfeng |
|
2019
|
Integrated production and multiple trips vehicle routing with time windows and uncertain travel times. Zbl 1458.90148
Wang, Dujuan; Zhu, Jiaqi; Wei, Xiaowen; Cheng, T. C. E.; Yin, Yunqiang; Wang, Yanzhang |
|
2019
|
The single-item lot-sizing problem with two production modes, inventory bounds, and periodic carbon emissions capacity. Zbl 1476.90028
Phouratsamay, Siao-Leu; Cheng, T. C. E. |
|
2019
|
On three color Ramsey numbers \(R(C_4, C_4, K_{1, n})\). Zbl 1400.05155
Zhang, Xuemei; Chen, Yaojun; Cheng, T. C. Edwin |
|
2019
|
Optimal online algorithms for MapReduce scheduling on two uniform machines. Zbl 1427.90146
Jiang, Yiwei; Zhou, Ping; Cheng, T. C. E.; Ji, Min |
|
2019
|
Efficient multi-attribute auctions considering supply disruption. Zbl 1418.90026
Xiang, Jie; Zhang, Juliang; Cheng, T. C. E.; Sallan, Jose Maria; Hua, Guowei |
|
2019
|
Server scheduling on parallel dedicated machines with fixed job sequences. Zbl 1418.90106
Cheng, T. C. E.; Kravchenko, Svetlana A.; Lin, Bertrand M. T. |
|
2019
|
Supply option contracts with spot market and demand information updating. Zbl 1403.90192
Zhao, Yingxue; Choi, Tsan-Ming; Cheng, T. C. E.; Wang, Shouyang |
|
2018
|
Buy online and pick up in-store: design of the service area. Zbl 1403.90129
Jin, Ming; Li, Gang; Cheng, T. C. E. |
|
2018
|
Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents. Zbl 1407.90185
Yin, Yunqiang; Yang, Yongjian; Wang, Dujuan; Cheng, T. C. E.; Wu, Chin-Chia |
|
2018
|
Quality disclosure strategies for small business enterprises in a competitive marketplace. Zbl 1403.91085
Zhao, Ming; Dong, Ciwei; Cheng, T. C. E. |
|
2018
|
Advances in stochastic programming and robust optimization for supply chain planning. Zbl 1458.90094
Govindan, Kannan; Cheng, T. C. E. |
|
2018
|
Bin packing game with a price of anarchy of \(\frac{3}{2}\). Zbl 1390.91022
Nong, Q. Q.; Sun, T.; Cheng, T. C. E.; Fang, Q. Z. |
|
2018
|
Why and how do branders sell new products on flash sale platforms? Zbl 1403.90458
Zhang, Mingyang; Zhang, Juliang; Cheng, T. C. E.; Hua, Guowei |
|
2018
|
Re-entrant flowshop scheduling with learning considerations to minimize the makespan. Zbl 1397.90196
Wu, Chin-Chia; Liu, Shang-Chia; Cheng, T. C. E.; Cheng, Yu; Liu, Shi-Yuan; Lin, Win-Chin |
|
2018
|
A bicriterion approach to common flow allowances due window assignment and scheduling with controllable processing times. Zbl 1411.90162
Wang, Dujuan; Yin, Yunqiang; Cheng, T. C. E. |
|
2017
|
Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs. Zbl 1375.90140
Yin, Yunqiang; Cheng, T. C. E.; Wang, Du-Juan; Wu, Chin-Chia |
|
2017
|
Two-agent scheduling on a single sequential and compatible batching machine. Zbl 1411.90151
Li, Shisheng; Cheng, T. C. E.; Ng, C. T.; Yuan, Jinjiang |
|
2017
|
Mean-risk analysis of wholesale price contracts with stochastic price-dependent demand. Zbl 1401.90044
Zhao, Yingxue; Choi, Tsan-Ming; Cheng, T. C. E.; Wang, Shouyang |
|
2017
|
Polarity graphs and Ramsey numbers for \(C_4\) versus stars. Zbl 1355.05167
Zhang, Xuemei; Chen, Yaojun; Cheng, T. C. Edwin |
|
2017
|
Preemptive parallel-machine scheduling with a common server to minimize makespan. Zbl 1411.90140
Cheng, T. C. E.; Kravchenko, Svetlana A.; Lin, Bertrand M. T. |
|
2017
|
Some values of Ramsey numbers for \(C_4\) versus stars. Zbl 1392.05079
Zhang, Xuemei; Chen, Yaojun; Cheng, T. C. Edwin |
|
2017
|
\(CON/SLK\) due date assignment and scheduling on a single machine with two agents. Zbl 1411.90166
Yin, Yunqiang; Wang, Du-Juan; Wu, Chin-Chia; Cheng, T. C. E. |
|
2016
|
Approximation schemes for single-machine scheduling with a fixed maintenance activity to minimize the total amount of late work. Zbl 1411.90132
Yin, Yunqiang; Xu, Jianyou; Cheng, T. C. E.; Wu, Chin-Chia; Wang, Du-Juan |
|
2016
|
Rescheduling on identical parallel machines with machine disruptions to minimize total completion time. Zbl 1346.90399
Yin, Yunqiang; Cheng, T. C. E.; Wang, Du-Juan |
|
2016
|
Two-agent scheduling in a flowshop. Zbl 1346.90342
Fan, B. Q.; Cheng, T. C. E. |
|
2016
|
Hybridization of tabu search with feasible and infeasible local searches for the quadratic multiple knapsack problem. Zbl 1349.90720
Qin, Jin; Xu, Xianhao; Wu, Qinghua; Cheng, T. C. E. |
|
2016
|
A hybrid evolutionary algorithm to solve the job shop scheduling problem. Zbl 1350.90018
Cheng, T. C. Edwin; Peng, Bo; Lü, Zhipeng |
|
2016
|
A mean-shift algorithm for large-scale planar maximal covering location problems. Zbl 1346.90498
He, Zhou; Fan, Bo; Cheng, T. C. E.; Wang, Shou-Yang; Tan, Chin-Hon |
|
2016
|
An alternative approach for proving the NP-hardness of optimization problems. Zbl 1346.90833
Cheng, T. C. E.; Shafransky, Y.; Ng, C. T. |
|
2016
|
A tabu search/path relinking algorithm to solve the job shop scheduling problem. Zbl 1348.90298
Peng, Bo; Lü, Zhipeng; Cheng, T. C. E. |
|
2015
|
Selling to strategic and loss-averse consumers: stocking, procurement, and product design policies. Zbl 1411.90185
Lee, Chang Hwan; Choi, Tsan-Ming; Cheng, T. C. E. |
|
2015
|
Single-machine common flow allowance scheduling with aging effect, resource allocation, and a rate-modifying activity. Zbl 1330.90031
Ji, Min; Yao, Danli; Yang, Qinyun; Cheng, T. C. E. |
|
2015
|
Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness. Zbl 1311.90057
Yuan, J. J.; Ng, C. T.; Cheng, T. C. E. |
|
2015
|
Iterated local search based on multi-type perturbation for single-machine earliness/tardiness scheduling. Zbl 1348.90302
Qin, Tao; Peng, Bo; Benlic, Una; Cheng, T. C. E.; Wang, Yang; Lü, Zhipeng |
|
2015
|
Single-machine batch scheduling with job processing time compatibility. Zbl 1310.90045
Li, Shisheng; Cheng, T. C. E.; Ng, C. T.; Yuan, Jinjiang |
|
2015
|
Single-machine batch scheduling of linear deteriorating jobs. Zbl 1311.90047
Ji, Min; Yang, Qinyun; Yao, Danli; Cheng, T. C. E. |
|
2015
|
A honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready times. Zbl 1443.90200
Yin, Yunqiang; Wu, Wen-Hung; Cheng, T. C. E.; Wu, Chin-Chia; Wu, Wen-Hsiang |
|
2015
|
Product variety and channel structure strategy for a retailer-Stackelberg supply chain. Zbl 1339.90177
Xiao, Tiaojun; Choi, Tsan-Ming; Cheng, T. C. E. |
|
2014
|
Make-or-buy service capacity decision in a supply chain providing after-sales service. Zbl 1339.90059
Li, Gang; Huang, Feng Feng; Cheng, T. C. E.; Zheng, Quan; Ji, Ping |
|
2014
|
Single-machine scheduling and due date assignment with rejection and position-dependent processing times. Zbl 1292.90130
Zhao, Chuanli; Yin, Yunqiang; Cheng, T. C. E.; Wu, Chin-Chia |
|
2014
|
Scheduling with a position-weighted learning effect. Zbl 1288.90022
Cheng, T. C. E.; Kuo, Wen-Hung; Yang, Dar-Li |
|
2014
|
Iterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness. Zbl 1297.90061
Xu, Hongyun; Lü, Zhipeng; Cheng, T. C. E. |
|
2014
|
Scheduling jobs with release dates on parallel batch processing machines to minimize the makespan. Zbl 1288.90032
Liu, L. L.; Ng, C. T.; Cheng, T. C. E. |
|
2014
|
Buyback contracts with price-dependent demands: effects of demand uncertainty. Zbl 1339.90075
Zhao, Yingxue; Choi, Tsan-Ming; Cheng, T. C. E.; Sethi, Suresh P.; Wang, Shouyang |
|
2014
|
Production planning and pricing policy in a make-to-stock system with uncertain demand subject to machine breakdowns. Zbl 1338.90152
Shi, Xiutian; Shen, Houcai; Wu, Ting; Cheng, T. C. E. |
|
2014
|
Single-machine scheduling with accelerating deterioration effects. Zbl 1288.90023
Cheng, T. C. E.; Tseng, Shih-Chang; Lai, Peng-Jen; Lee, Wen-Chiung |
|
2014
|
Optimal algorithms for semi-online machine covering on two hierarchical machines. Zbl 1359.90046
Wu, Yong; Cheng, T. C. E.; Ji, Min |
|
2014
|
Competitive ratios for preemptive and non-preemptive online scheduling with nondecreasing concave machine cost. Zbl 1339.90142
Jiang, Yiwei; Hu, Jueliang; Liu, Longcheng; Zhu, Yuqing; Cheng, T. C. E. |
|
2014
|
The planar Ramsey number \(\mathrm{PR}(C_4,K_8)\). Zbl 1288.05170
Chen, Yaojun; Cheng, T. C. E.; Zhang, Yunqing; Zhou, Guofei |
|
2014
|
Extreme tenacity of graphs with given order and size. Zbl 1306.90026
Cheng, T. C. E.; Li, Yin-Kui; Xu, Chuan-Dong; Zhang, Sheng-Gui |
|
2014
|
Scheduling with a position-weighted learning effect based on sum-of-logarithm-processing-times and job position. Zbl 1293.90023
Cheng, T. C. E.; Kuo, Wen-Hung; Yang, Dar-Li |
|
2013
|
Coordination of supply chains with bidirectional option contracts. Zbl 1317.90062
Zhao, Yingxue; Ma, Lijun; Xie, Gang; Cheng, T. C. E. |
|
2013
|
Bounded parallel-batching scheduling with two competing agents. Zbl 1280.90043
Fan, B. Q.; Cheng, T. C. E.; Li, S. S.; Feng, Q. |
|
2013
|
Single-machine scheduling with past-sequence-dependent delivery times and a linear deterioration. Zbl 1276.90030
Yin, Yunqiang; Cheng, T. C. E.; Xu, Jianyou; Cheng, Shuenn-Ren; Wu, Chin-Chia |
|
2013
|
An optimal online algorithm for single parallel-batch machine scheduling with incompatible job families to minimize makespan. Zbl 1286.90054
Fu, Ruyan; Cheng, T. C. E.; Ng, C. T.; Yuan, Jinjiang |
|
2013
|
Quality uncertainty and quality-compensation contract for supply chain coordination. Zbl 1317.90050
Lee, Chang Hwan; Rhee, Byong-Duk; Cheng, T. C. E. |
|
2013
|
Two-agent singe-machine scheduling with release times to minimize the total weighted completion time. Zbl 1349.90329
Cheng, T. C. E.; Chung, Yu-Hsiang; Liao, Shan-Ci; Lee, Wen-Chiung |
|
2013
|
...and 282 more Documents |